



Boom quick coupler HRD/UHD
Free, no obligation. Your details go only to BECO, who'll be in touch shortly.
Tracked excavators 20 tons and above Wheeled excavators 20 tons and above Material handlers 20 tons and above Demolition excavators 20 tons and above
Monoboom with hydraulic modular joint
Modification of standard monoboom into base boom and excavation front with
hydraulically operated modular joint for connecting of excavation equipment and/ or
High Reach Demolition(HRD) equipment.
+ Hydraulically operated modular joint for mounting of High Reach Demolition front
(HRD front) and/or excavation front
base boom
+ Hydraulic lines with hoses, ball valves and SAE flanges positioned at quick coupler
for connecting of:
+ Hydraulic lines with Fastner multi coupler
+ SLI (Safe Load Indicator)
Excavation monoboom equipment
Modified monoboom into 2nd boom part with modular joint for connecting to
base boom
+ Monoboom (complete) : ...00 mm & ...00mm
Arm : .....0 mm
+ Modular joint for mounting to modular joint of baseboom. 2 positions
+ Hydraulic lines with hoses with ball valves and flanges (SAE-type) for connecting to
hydraulic lines at baseboom of;
+ Hydraulic lines with Fastner multi coupler to hydraulic lines at baseboom
+ Cylinders (including bushings, pins and seals) of original ...brand name... make
+ Excluding (quick) couplers at arm for connecting hoses of attachment
(e.g. breaker, crusher)
+ Basic transport rack for positioning/transport in disassembled position
Boom quick coupler HRD/UHD
Free, no obligation. Your details go only to BECO, who'll be in touch shortly.